Budapest · new-build apartmentsInterior architecture before handover

By the day of handover, everything is ready.

In most new-build apartments the thinking starts after the keys change hands — and months pass before the first piece of furniture arrives. With us it works the other way round: by the time you go to the site inspection the design is finished, the quotes are in, and on site the joiner only takes the exact measurements.

Bright dining area with a large glazed façade in a Budapest new-build apartment
The difference

The developer hands over square metres. The rest is up to you — or to us.

At the site inspection we are not brainstorming but checking dimensions. The joinery drawings are already finished.
The quotes are already in your hands, because the trades priced precise drawings rather than a verbal description.
The services and electrical outlets sit where the furniture needs them — not the other way round.
After the keys change hands it is not the design that begins, but the production.
1–3

months for the full design process, depending on the size of the flat

4–6

months before handover is the right time to start so everything falls into place

0

weeks lost after the keys arrive — production can start immediately

Timeline

What happens, and when

The earlier we start, the more stays open — and the less breaking out is needed later.

4–6 months before handover

Space planning and technical decisions

Floor plan options, the position of partitions, finalising water and electrical outlets. This is the window in which the biggest changes cost the least — afterwards it means breaking out.

2–4 months before handover

Visualisation, finishes, lighting

You walk through your future home in photorealistic visualisations. The tiling layout, the lighting and switching plan are drawn, and the materials are finalised.

1–2 months before handover

Joinery drawings and quotes

Manufacturing-level drawings for the bespoke joinery are completed and sent out to joiners for pricing. The quotes come back on precise drawings rather than a verbal brief — which is what makes them comparable.

The day of the site inspection

Only the measuring is left

This is the turning point. The joiner comes with you to the inspection and, working from the finished drawings, checks the actual wall dimensions on site. No concept to find — production can begin.

After the keys

Production and moving in

The furniture is made, the finishes go on, the layer of light falls into place. You are not waiting months for the design — that part is behind you.

New-build specifics

What we pay particular attention to in Budapest new-builds

A new build is a different task from a renovation: fewer constraints, but more decisions — and most of them have to be made before handover.

Large glazing, few walls

The panorama is a gift, but it makes furnishing harder. We build the space planning around the openings and the view rather than around the walls.

Orientation and shading

A western aspect means heat gain in summer and reflections at night. Shading and the evening lighting scene are part of the concept, not a later repair.

Services and outlets

The position of water and electrical outlets can still be moved before handover; afterwards it means breaking out. That is why starting early pays.

Storage in a compact plan

New-build layouts rarely include a pantry. We solve storage with built-in, made-to-measure joinery so the space does not shrink.

How it looks in the end

New-build spaces, designed through

Open-plan living and kitchen in a Budapest new-build apartment
Open-plan living and kitchen — organised around your day
Bright kitchen with natural timber surfaces
Kitchen with built-in storage
Concealed atmospheric lighting in a modern living room
The evening layer of light
Bedroom with a large glazed façade in a new-build apartment
Bedroom facing the view
Built-in wardrobe with timber drawers
Wardrobe — made to measure
Modern bathroom with large-format tiling
Bathroom with a precise layout
Entrance hall with built-in storage in a new-build apartment
Entrance — the first impression
Sketch portrait — Lívia Kozma, the founder of InteriorVibe
The founder

„A home should be designed and furnished so that walking into it brings happiness and joy. What I want to help with is making the home you dreamed of come true in full.”

Lívia Kozma · founder and creative director of InteriorVibe

Read Livi’s story

A calm decision

What you do not need to fear

That you will miss the window for changes

At the first consultation we tell you, based on the floor plan, what can still be changed and what would already require breaking out.

That the budget will run away

A realistic cost framework is part of the design: you see the price of materials and furniture in advance, so you make the decisions — not the situation.

That the build will descend into chaos

Complete documentation speaks the contractor’s language: tiling layout, dimensions, schedules. Fewer questions, fewer mistakes, less stress.

See our full design service

Questions

What most people ask

Ideally four to six months before handover. That way the full documentation is ready by the day of the site inspection, the joiner can take exact measurements on site, and the quotes are already in your hands. If you have taken over the flat it is not too late — there is simply less room to manoeuvre.

It means the final joinery drawings exist by then, so the joiner is not looking for a concept on site but checking the actual dimensions of the walls. That is the difference between one week and three weeks of production preparation.

Non-loadbearing partitions, finishes, the position of electrical and water outlets, the lighting and the entire furnishing are usually free to design. The structure, the façade and the common areas are not. At the first consultation we tell you exactly what is possible, based on the floor plan.

We prepare the documentation so that both the developer’s contractor and your own trades can work from it unambiguously. Coordinating delivery is available under a separate agreement.

Typically one to three months, depending on the size of the flat and your requirements. You receive the exact schedule after the first consultation.

A large glazed façade is both a gift and a task: heat gain in summer, reflections in the evening, and few walls to furnish against. That is why orientation, shading and the evening lighting scene are all designed during the concept stage.

Let us begin

Apply for a consultation using this short form

Five questions, one minute. We will then get in touch and talk through what fits your apartment — and how much time is left before handover.

1 / 5

Where is the property located?

The perfect arrival.

We do not sell illusions but liveable, workable spaces. We measure success at the moment you first step inside — and you are home.

Book a consultation
Budapest new-build apartment design | InteriorVibe Studio